EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content
Widening on SR 414 in Orange County near City of Maitland [424217-1] View Project
  • Sunday, July 14th, 2019 to Saturday, August 31st, 2019

    Florida Department of Transportation

    RON DESANTIS
    GOVERNOR

    719 South Woodland Boulevard

    DeLand, Florida 32720-6834

    KEVIN J. THIBAULT, P.E.
    SECRETARY

     

     

    For Immediate Release
    July 12, 2019

    Contact: Steve Olson
    (386) 943-5479

    Steve.Olson@dot.state.fl.us

     

    State Road 414 (Maitland Boulevard) Resurfacing Begins Sunday

     

     Maitland, Fla – The Florida Department of Transportation (FDOT) is beginning a project on State Road (S.R.) 414 between Sandspur Road and the US 17/92 bridge on Sunday, July 14.

     

    Phase one of the project consists of milling and resurfacing the roadway. Motorists can expect single lane closures during overnight hours from 8:30 p.m. to 6:30 a.m., typically from Sunday night(s) through early Friday morning(s).

     

    The second phase of the project, which begins later, widens S.R. 414 (Maitland Boulevard) from a four-lane road to six-lane road. The project limits extend from east of Interstate 4 (I-4) to east of County Road (C.R.) 427. The widening is occurring to the inside, in the median.

     

    Please note construction schedules may change due to weather or other unforeseen circumstances. Electronic message boards will be used to alert drivers.

    Media inquiries should be directed to the FDOT Communications Office at FDOT-D5COMM@dot.state.fl.us or by phone at 386-943-5479. Project information is also available online at www.CFLRoads.com.

    FDOT urges all drivers to stay alert and use caution while driving through or near construction zones. When driving, walking, or bicycling, remember to pay attention and follow the rules. Safety doesn’t happen by accident. 

     ###

     

    Florida Department of Transportation

    Innovative, Efficient and Exceptional

     

                ---------------------------------------------------------------------------------------

    CFLRoads.com | @MyFDOT_CFL | Facebook.com/MyFDOTCFL

  • Sunday, July 21st, 2019 to Friday, July 26th, 2019

    Contractor will be milling and resurfacing SR 414 (Maitland Blvd) from just after Hope Road to the CSX RR/US 17/92 Bridge. They will begin work Sunday night, July 21 through Friday morning, July 26 from 8:30 p.m. to 6:30 a.m.

    The existing pavement will be milled and resurfaced with cross slope correction. The Contractor will use alternating lanes during the milling and resurfacing to allow motorists to travel on SR 414.

Resurfacing [437345-1] View Project
  • Monday, July 15th, 2019 to Saturday, July 27th, 2019

    Monday -Friday, 3 a.m.-6 p.m. Single lane closures in both eastbound and westbound directions can be expected on S.R. 50 (Cheney Highway) for roadwork.

Widening on SR 482 in Orange County near City of Orlando [407143-5] View Project
  • Sunday, July 21st, 2019 to Friday, July 26th, 2019

    8 p.m. to 7 a.m.
    Eastbound and westbound alternating lane closures from Universal Boulevard to John Young Parkway. Contractor will continue to have various lane closures for Shingle Creek bridge work in both eastbound and westbound directions and for drainage/force main/water main/sidewalk and curb work.

Widening on SR 423 in Orange County near City of Orlando [239496-3] View Project
  • Sunday, July 21st, 2019 to Saturday, July 27th, 2019

    8:30 p.m. to 6 a.m.
    Northbound and southbound lane closures for maintenance of traffic, signalization, and paving.

  • Sunday, July 28th, 2019 to Monday, July 29th, 2019

    A second major traffic shift for John Young Parkway (State Road 423) between State Road 50 (West Colonial Drive) and Shader Road is scheduled for this Sunday, July 21.

    Please note this schedule can change due to weather or other unforeseen circumstances.  

    The overnight work will reconfigure the southbound lanes between Technology Drive and Shader Road. Southbound traffic from Technology Drive to Silver Star Road (State Road 416) will shift east onto the temporary pavement in the median. Then once past Silver Star Road, southbound traffic will shift west onto the newly constructed southbound lanes.

Drainage Maintenance on SR 50 in Orange County near City of Orlando
  • Monday, July 22nd, 2019 to Sunday, August 4th, 2019

    Nighttime single lane closures between Peachtree Road and the entrance to Orlando Fashion Square mall for pipe desilting and video inspection.

  • Monday, July 22nd, 2019 to Sunday, August 4th, 2019

    Nighttime single lane closures between Bennett Drive and Old Cheney Highway for pipe desilting and video inspection.

Bridge Construction on US 17/92 in Orange County near City of Maitland [437872-2] View Project
  • Monday, July 22nd, 2019 to Sunday, August 4th, 2019

    Single and double lane closures on US 17/92 northbound lanes.

    Lane closure will begin at the intersection of Lee Road and Orlando Avenue (US 17/92) and the work zone will end at the intersection of Lake Avenue and Orlando Avenue (US 17/92).

    The Contractor will be sandblasting, painting and applying intermediate and finish coat. The work will begin Monday, July 22 thru Sunday, August 04, from 9 p.m. to 9 a.m.

More Information