Resurfacing on SR 520 in Orange County [439233-1] View Project
  • Friday, May 1st, 2020 to Saturday, July 11th, 2020

     

    *Please be advised that the contractor will be completing some of the final paving activities at both the intersections of Maxim Parkway and Macon Parkway through June, weather permitting.  The contractor will work on one intersection at a time and one lane will remain open for access into the Wedgefield Community.

     

    Monday-Friday, 7 a.m. to 7 p.m. S.R 520 just before Maxim Parkway to S.R. 50 westbound, single lane closures.

    Monday-Friday, 7 a.m. to 7 p.m. S.R 520 from S.R. 50 to S.R. 528 eastbound single lane closures. Lane closures can be expected in this area alternating between the left lane, right lane and turn lanes.

Resurfacing on SR 551 in Orange County [437544-1] View Project
  • Thursday, July 2nd, 2020 to Saturday, July 11th, 2020

    ·       Sunday, July 5, to Friday, July 10, from 7 a.m. to 4 p.m. Daily: Motorists are advised of intermittent single-lane closures southbound between Pershing Avenue and Curry Ford Road for installation of traffic signal foundations.

    ·       Monday, July 6, to Friday, July 10, from 8 p.m. to 7 a.m. Nightly: Motorists are advised of intermittent alternating single-lane closures in the northbound and southbound lanes within the project limits for side street and turn lane milling and paving work.

Resurfacing on SR 551 in Orange County [439235-1] View Project
  • Thursday, July 2nd, 2020 to Saturday, July 11th, 2020

    ·       Sunday, July 5, to Friday, July 10, from 7 a.m. to 4 p.m. Daily: Motorists are advised of a right (outside) lane closure southbound within the project limits for concrete curb and sidewalk replacement.

    ·       Sunday, July 5, to Friday, July 10, from 9 p.m. to 7 a.m. Nightly: Motorists are advised of a right (outside) lane closure southbound within the project limits for concrete curb and sidewalk removal.

Widening on SR 482 in Orange County near City of Orlando [407143-4] View Project
  • Sunday, July 5th, 2020 to Sunday, July 12th, 2020

    9 p.m. to 6 a.m. Sunday through Saturday
    Possible lane closures on International Drive for drainage work, asphalt work, and curb and sidewalk reconstruction.

    Please note: Due to the decrease in traffic volumes, there may be daytime lane closures on International Drive.

Railroad Improvement [992000-3] View Project
  • Monday, July 6th, 2020 to Friday, July 24th, 2020

    CONSTRUCTION SCHEDULE

    DeBary:
    Barwick Road
    Date: Tuesday July 21, 2020
    Time: 11:00PM to 4:00AM

    F P & L Drive
    Date: Tuesday July 21, 2020
    Time: 11:00PM to 4:00AM

    Ft. Florida Road
    Date: Wednesday July 22, 2020
    Time: 11:00PM to 4:00AM

    Highbanks Road
    Date: Thursday July 23, 2020
    Time: 11:00PM to 4:00AM

    Lake Mary:
    Pedigo Point
    Date: Monday July 20, 2020
    Time: 11:00PM to 4:00AM

    Casselberry:
    Plumosa Avenue
    Date: Monday July 20, 2020
    Time: 11:00PM to 4:00AM

    Altamonte Springs:
    Merritt Street
    Date: Sunday July 19, 2020
    Time: 11:00PM to 4:00AM

    OBrien Road
    Date: Sunday July 19, 2020
    Time: 11:00PM to 4:00AM

    Maitland:
    Ventris Avenue
    Date: Thursday July 16, 2020
    Time: 11:00PM to 4:00AM

    Lake Avenue
    Date: Thursday July 16, 2020
    Time: 11:00PM to 4:00AM

    Sybelia Avenue
    Date: Friday July 17, 2020
    Time: 11:00PM to 4:00AM

    George Avenue
    Date: Friday July 17, 2020
    Time: 11:00PM to 4:00AM

    Orlando:
    W. Pineloch Avenue
    Date: Monday July 13, 2020
    Time: 11:00PM to 4:00AM

    W. Marks Street
    Date: Tuesday July 14, 2020
    Time: 11:00PM to 4:00AM

    Wilkinson Street
    Date: Wednesday July 15, 2020
    Time: 11:00PM to 4:00AM

    Edgewood:
    Fairlane Avenue
    Date: Wednesday July 8 and Thursday July 9, 2020
    Time: 11:00PM to 4:00AM

    Stratemeyer Drive
    Date: Friday July 10, 2020
    Time: 11:00PM to 4:00AM

    Holden Avenue
    Date: Sunday July 12, 2020
    Time: 11:00PM to 4:00AM

    Drennen Avenue
    Date: Monday July 13, 2020
    Time: 11:00PM to 4:00AM

    Taft:
    Fourth Street
    Date: Monday July 6, 2020
    Time: 11:00PM to 4:00AM

    Pine Street
    Date: Tuesday July 7 and Wednesday July 8, 2020
    Time: 11:00PM to 4:00AM