-
8:00 a.m. Monday, September 15, through 6 p.m. Friday, September 19
Motorists can expect intermittent inside and outside lane closures eastbound and westbound U.S. 192 (S.R. 500) from Brandywine Lane to Babcock Street.
These closures are needed for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
8 p.m. Sunday, September 14, through 7 a.m. Thursday, September 18
Motorists can expect intermittent inside and outside lane closures eastbound and westbound U.S. 192 (S.R. 500) from Brandywine Lane to Babcock Street.
These closures are needed for miscellaneous construction activities.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!