View project: S.R. 436 from U.S. 441 to Seminole County Line
-
Monday, July 13 to Friday, July 17, from 8 p.m. to 6 a.m. the following morning: Motorists can expect alternating single-lane closures in both directions of S.R. 436, between South Orange Blossom Trail (U.S. 441), and the Seminole County Line. These closures are necessary for crews to install signal loops at the intersections with Sheeler Avenue, South Thompson Avenue, Semoran Commerce/McVilla Avenue, and Piedmont Wekiwa Road/Wekiwa Springs Road.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!