450666-2 S.R. A1A from U.S. 1 to Davis Street Safety Project
Project Details
| Work Type: | Safety Project |
|---|---|
| Phase: | Construction |
| Length: | 6.515 miles |
| City: | |
| County: | |
| Road: | |
| Construction Cost: | $1.4 Million |
| Project Start: | Early 2026 |
| Est. Completion: | Summer 2026 |
About
The purpose of this project is to enhance pedestrian safety along State Road (S.R.) A1A in Daytona Beach and Daytona Beach Shores. The project will install two new midblock crossings with pedestrian activated signals called Rectangular Rapid Flashing Beacons (RRFBs) at Sea Spray Street/Andrianopoulos Park and near Browning Avenue. RRFBs are pedestrian-activated signals that display flashing yellow lights to alert drivers that a pedestrian is ready to cross. By state law, vehicles must stop at all marked crosswalks when a pedestrian is present.
To learn more about Rectangular Rapid Flashing Beacons (RRFBs), including how to use them:
Plans also call for upgrading the other seven existing pedestrian crossings by adding in-road lighting and overhead lighting.
This project is being constructed with a resurfacing project that extends from U.S. 1 (Ridgewood Avenue) to Davis Street (FPID No. 450666-1).
Contact Information
Lane Closures
-
Monday, April 6, to Friday, April 10, from 7 a.m. to 5 p.m.: Motorists can expect inside single lane closures on northbound State Road (S.R.) A1A from International Speedway Boulevard (U.S. 92) to Frazar Road to allow for paving operations.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!
-
Monday, April 6, to Friday, April 10, from 7 a.m. to 5 p.m.: Motorists can expect inside single lane closures on northbound State Road (S.R.) A1A from Poinsettia Road to Browning Avenue to allow for underground utility work.
FDOT encourages all roadway users to drive, walk and ride with caution and courtesy!