EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Interchange Construction
Phase: Design
Length: 0.216 miles
City:
County:
Road:
Design Cost: $410,000
Letting: 08/06/2024
Estimated Costs
Construction Cost: $1.2 Million
About

The purpose of this project is to enhance safety and efficiency at the Interstate 95 (I-95) interchange at Old Dixie Highway.  The project proposes to widen the southbound I-95 off ramp to Old Dixie Highway to provide two 12-foot-wide travel lanes, a 10-foot-wide paved outside shoulder and a 4-foot-wide paved inside shoulder. The off ramp will also be realigned to provide a shared straight and left turn lane and a modified dedicated right turn lane separated by a raised concrete island.

Contact Information
Design Project Manager
Stefan Levine
(386) 943-5394
Stefan.Levine@dot.state.fl.us