Project Details
Work Type: Drainage Construction
Phase: Design
Length: .001 miles
City:
County:
Road:
Letting: 06/01/2021
Estimated Costs
ROW Cost: $248,000
Construction Cost: $1.9 MIllion
About
This project will rehabilitate an existing FDOT drainage ditch that carries water from U.S. 1 to the Indian River Lagoon.  To assist the State Road (S.R.) 528 widening project (407402-2), this project also includes the re-construction of historic drainage pipes from the infield ponds at the intersection of S.R. 528 and U.S. 1 to drain the ponds westward, under U.S. 1 and the Florida East Coast Railway.  A pond is also being constructed for compensatory treatment for S.R. 528, near the U.S. 1 ditch.
Contact Information
Design Project Manager
Marcus Lisicki
(386) 943-5542
Marcus.Lisicki@dot.state.fl.us
Design Firm
Consor Engineers, LLC
(407) 957-1660