Project Details
Work Type: Intersection Construction
Phase: Design
Length: .400 miles
County:
Road:
Letting: 07/02/2024
Estimated Costs
ROW Cost: $18.9 Million
Construction Cost: $7.2 Million
About

The purpose of this project is to construct a new quadrant road to connect the Fern Drive at Pleasant Hill Road intersection with the existing Oaks Boulevard opening on John Young Parkway (U.S. 17-92/State Road 600). Other improvements include realigning Oaks Boulevard to the west with a signalized connection to the quadrant road and adding new traffic signals at Pleasant Hill Road and Fern Drive, and on John Young Parkway at the new quadrant road.

 

The concept design was developed through an interim improvement study completed in 2019. Information about the study is included in documents below.