ROW Cost: | $48 Million |
---|---|
Construction Cost: | $90 Million |
About
John Young Parkway (U.S. 17-92/State Road (S.R.) 600), an Emergency Evacuation Route, will be widened by adding a lane within the median in each direction. The proposed typical section will be a six-lane (11-foot-wide lanes) divided urban highway with a 22-foot-wide median, 7-foot-wide bike lanes and 5-foot-wide sidewalks in each direction.
The southern end of the project will have an expanded intersection and a new flyover from John Young Parkway to Pleasant Hill Road. The project has several new ponds and right of way (R/W) acquisition is needed. This project ends at Portage Street.
Contact Information
Design Project Manager |
---|
Hatem Aguib
(386) 943-5559
hatem.aguib@dot.state.fl.us
|
Design Firm |
WBQ Design & Engineering, Inc.
|