Central Florida Roads

Florida Department of Transportation

Project Details
Work Type: Widening
Phase: Design
Length: 1.963 miles
City:
County:
Road:
Estimated Costs
ROW Cost: $2.5 Million
Construction Cost: $20.5 Million
About
This project consists of widening and reconstructing State Road (S.R.) 500 / U.S. 441 to a six-lane divided urban roadway from north of S.R. 46 to S.R. 44/Donnelly Street in Lake County, a total distance of approximately 2.4 miles. The proposed roadway typical section is a high speed urban roadway consisting of six 12-foot travel lanes (three in each direction) with a 6.5-foot-wide inside paved shoulder, 6.5-foot-wide outside paved shoulder (for bicycle lanes), and curb and gutter. The median separation is 30 feet in width.

The existing pavement (24 feet in each direction) of the existing travel lanes is proposed to be milled and resurfaced. Five-foot-wide sidewalks are provided on both sides within the existing right of way. Storm drains and stormwater ponds would be required. Right of way acquisition is anticipated to accommodate stormwater ponds and drainage easements, and intersection improvements (at the U.S. 441/Donnelly Street/S.R. 44 signalized intersection and the U.S. 441/Pine Avenue unsignalized intersection).

Contact Information
Design Firm
CDM Smith, Inc
Design Project Manager
Ty Garner
(386) 943-5299