428860-1 US 1 (SR 5) from south of 1st St. to pavement joint north of Rocky Pt. Rd. (southbound lanes only)
About
The purpose of the project is to extend the life of the pavement by milling and repaving the southbound roadway. A 5-foot bike lane keyhole will be provided southbound at Valkaria Road, a U-Turn bulb-out will be paved in front of Bill’s Discount Marine and the side drain at the driveway for Orbit R.V. Park will be reconstructed. This project will not require right-of-way acquisition.
Project Details
- Phase:
- Design
- Work Type:
- Construction
- Length:
- 3.13
- City:
- County:
- Road:
- Design Schedule:
- View
- Letting:
- 7/23/2014
Estimated Costs
- Construction:
- $1,850,000
Contact Information
Design Firm
Balmoral Group, LLC (The)
Last Updated
~ 6 months ago