This project has been completed and is only available for historical reference.
About

  • Widen and reconstruct existing 5-lane rural roadway to 6-lane urban divided roadway with raised 30’ median, sidewalks, and irrigation sleeves from W. of CR 545 (Avalon Blvd.) to SR 429 (Western Beltway) (MP 3.019 – 6.075)

  • Closed drainage system to include four ponds within FDOT Right-of-Way

  • Signalization to include new mast arms, pedestrian signals, and interconnect at 8 intersections

  • Signing and pavement marking to current FDOT standards

  • Utility coordination and relocation is anticipated, including a Utility Work by Highway Contractor with the City of Winter Garden for the construction and relocation of sanitary sewer and water facilities

  • Potential Landscaping and Hardscaping elements to be coordinated with City of Winter Garden