Skip to Content
About
I-4 (SR 400) project consist of widening to 6 lanes from East of SR 44 to West of I-95 and reconfiguration of I-4 and SR 92 Interchange. The existing left hand exit from Eastbound I-4 to SR 92 will be change to right hand exit. Project includes also 3 animal crossings.
Lane Closures
  • Sunday, April 13th to 19th

    I-4 Closures:

    Monday (04/14) through Saturday (04/19)

    • Eastbound and westbound outside shoulder closures will take place along I-4 from SR-44 to I-95.
    • 7:00am – 5:00pm

    Sunday (04/13) through Thursday (04/17)

    • Westbound lane closures for temporary shoulder construction
    • 8:00pm to 6:00am

    US-92 Closures:

    Monday (04/14) through Friday (04-18)

    • Eastbound and westbound lane closures
    • 9:00am – 4:00pm

    Special Note: Motorists should be aware of trucks entering and exiting the highway from the median and outside shoulders.Motorists should also be aware of traffic shifts along I-4 near SR-44 at Ramp A to US-92 and just west of I-95.

  • Sunday, April 20th to 26th

    I-4

     

    • Monday through Saturday (daytime, 7:00am – 5:00pm): eastbound/westbound outside shoulder closures from SR44 to I-95.

     

    • Sunday through Thursday (nighttime, 8:00pm – 6:00am): westbound lane closures for temporary shoulder construction. 

     

    US 92

     

    • Monday through Friday (daytime, 9:00am – 4:00pm) lane closures eastbound and westbound.

     

    • *Please note: Motorists should be aware of trucks entering and exiting the highway from the median and outside shoulders.  Motorists should be aware of traffic shifts on I-4 near SR-44, at Ramp A to US-92 and just west of I-95.