The project would reconstruct State Road (S.R.) 200 to a rural four lane divided roadway, with a total right of way of 200 feet throughout the project. The proposed typical section would provide two 12-foot-wide travel lanes in each direction separated by a 40-foot-wide median. The roadway also will consist of 6-foot-wide inside shoulders (2 feet paved) and an 8-foot-wide outside shoulder (5 feet paved).

This section of the roadway contains two proposed wildlife crossing bridges, a single proposed Equestrian crossing bridge and a trail access bridge. Wildlife fencing will be extended along portions of the FDOT right of way that is adjacent to public land.  The right of way necessary to build the project has already been acquired; however currently there is no funding for construction.