EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content

This article has been archived and is only available for historical reference.

Weekly Interstate Report

Major Construction Projects

 

Lane closures for week beginning:

02/22/2015

 

 

 

 

Interstate 4 Construction Projects

 

 

 

 

 

429080-1

Seminole Co

I-4 Repaving from east of SR 434 to west of Lake Mary Blvd

Sunday - Friday

10:00 p.m. - 6:00 a.m.

EB/WB single and double lane closures may not occur due to the overnight temperatures.

432149-1

Orange Co

I-4 Dynamic Message Sign (DMS) Replacement Phase II

Monday

2:00 p.m. - 4:00 a.m.

WB single lane closures between the Daryl Carter Parkway overpass and SR 400 exits.

 

Tuesday

12:30 a.m. - 4:30 a.m.

All lanes closed between W. Osceola Parkway overpass and the Beachline (SR 528) exits.  Detour in place.

 

Wednesday

10:00 p.m. – 5:30 a.m.

EB/WB single or double lane closures to the Daryl Carter Parkway overpass and SR 400 exits.

429079-1

Orange Co

I-4 Resurfacing, Restoration and Rehabilitation    from the Osceola County line to East of SR 536

No lane closures.  

408464-1

Volusia Co

I-4 Widening from SR 44 to east of I-95

Monday - Friday

7:00 a.m. - 5:00 p.m.

EB/WB outside shoulder closures from SR 44 to I-95.

 

Monday  - Thursday

8:00 p.m. - 6:00 a.m.

WB/EB lane closures as needed for preparation for traffic shifts.

 

Wednesday

12:00 p.m. – 4:00 a.m.

Traffic pacing WB to SR 44

 

Thursday

EB traffic shifted to WB roadway between SR 44 and US 92 exits.

 

432149-1

Osceola Co

I-4 Dynamic Message Sign (DMS) Replacement Phase II

Thursday

10:00 p.m. - 5:30 a.m.

EB single and double lane closures between the Central Florida Greenway off-ramp and SR 400 exit.

 


 

Interstate 75

 

408562-9

Marion Co

Sumter Co

I-75 Maintenance Project

Sunday - Saturday

10:00 p.m. - 6:00 a.m.

Slow moving operations with possible NB/SB lane closures for pavement marking.

 

408562-9

Sumter Co.

I-75 from Hernando County line to CR 470

Sunday-Thursday

8:00 p.m. - 7:00 a.m.

NB single outside lane closures from the Hernando County Line/Withlacoochee River to CR 476B exit.

SB single outside lane closures near SR 48 exit.

 

Sunday 8:00 p.m. - Monday 5:00 p.m.

Northbound Rest Area closed for the building of the south temporary barrier wall.

 

Monday

8:00 p.m. - 7:00 a.m.

SB lanes near SR 48 exit will have rolling road blocks for temporary striping.

 

 

 

Interstate 95 Construction Projects

 

 

 

406869-8

Brevard Co

I-95 widening from SR 406 to SR 44

Sunday - Friday

6:30 p.m.  - 6:30 a.m.

NB/SB double lane closures.

 

406869-8

Volusia Co

I-95 widening from SR 406 to SR 44

Sunday

10:00 p.m. - 6:00 a.m.

NB/SB double lane closures.

 

Monday - Friday

6:30 p.m.  - 6:30 a.m.

NB/SB double lane closures.