EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content

This article has been archived and is only available for historical reference.

 

 

 

 

 

LOCATION

WORK TO BE PERFORMED

WORK PERFORMED BY

DESCRIPTION OF LANE CLOSURES

DATE/TIME

SR 44 between Shell Road and Old New York Avenue

Ditch Cleaning

FDOT

(Grady)

Westbound

8/07 – 8/13

8:00 a.m. – 5:00 p.m.

SR 5 Volusia/Flagler Line to CR 200

Pole Replacement

FPL – Permit

Northbound

Right Lane

8/07 – 10/13

M-F 8:00 a.m.- 5:00 p.m.

SR 100W

Ditch Cleaning

City of Bunnell (BMS)

Between Deen Rd. & E. Black Pointe Rd.

8/08 - 8/12

7:30 AM – 3:00 PM

SR 483 between ERAU and Hancock

Sidewalk Install

Embry – Riddle

Southbound

Right Lane

8/07 – 8/05

8:00 a.m. – 4:00 p.m.

SR 5 at Broadway St. & Benton Rd.

Shoulder Work

FDOT

(D. Grady)

North and Southbound

Intermittently Left Lane

8/09 – 8/12

8:00 a.m.  – 4:30 p.m.

 

                                                    Interstate Construction Lane Closures

 

I-4 and I-95 lane closure and construction information is also posted at www.cflroads.com.  Just go to current projects, look for I-4 or I-95, point and click.

 

For a look at incidents on Interstate 4 and other state roads, before leaving your home or office, log onto http://www.fhp.state.fl.us/traffic/index.html.    This website provides accurate information on events, such as crashes and fires, which affect travel in the region. This information is updated every five minutes by the Florida Highway Patrol. 


 

                                              FDOT Daytona Construction Lane Closures

 

 

 

 

 

427809

W.W. Engineering, Inc.

$1,179,043.00

SR 5A – Nova

% Complete - %

Work Began:

Est. Complete: Winter 2011

Project consists of desliting, video inspection and joint sealing of storm drain pipes on SR-5A, SR-442, SR-421 and SR A1A, yard drain replacement on SR-5A and repairs and desilting at the Ora Street outfall structure at the Intercoastal Waterway in Volusia County.

Sunday thru Saturday 24 hours.  Day and night work.

SR-5A Possible 1 or 2 lanes in each direction in Port Orange & Ormond Beach.  SR 442, 1 lane closed.  SR-421 possible 1 or 2 lanes in each direction between I-95 and Nova Rd. 

 

422024

Superior Construction Co.

$13.65 million

US 92

 

% Complete - %

Work Began:

Est. Complete: February 2013

From MP 2.763 to MP 7.2 Concrete repairs plus 2 bus layouts to be added.

Traffic shifted to 2-way, 2-lane traffic both east and west bound on SR 600/SR92 from Kepler Rd east to Clarks Bay Road.Speed limit has been reduced from Kepler Rd. to W. Parkway to 45mph to 55mph from W. Parkway east to Clark Bay Rd. Sunday thru Saturday 7:00 am to 7:00 pm  

 

240992

P&S Paving, Inc.

$2,352,927.99

US 1 - Intersections

Mason Ave and

Granada Blvd

% Complete - %

Work Began:

Est. Complete: Winter 2011

Intersection improvements at US1 and Mason Ave. and US-1 and Granada Blvd. Improvements include mast arms, upgrades to sidewalk and ADA ramps, milling and resurfacing and new striping in Volusia County

Day time shoulder and sidewalk closures and night time travel lane closures are expectedSunday thru Saturday 24hrs/day

 

422030

P&S Paving

$2.35 million

SR 40

% Complete - %

Work Began:

Est. Complete: September 2011

From Granada Bridge to SR A1A.  Resurfacing

Night time travel lanes closures may be expected. Sunday thru Saturday 24hrs/day

 

422032

P&S Paving

$2.48million

Nova Rd

% Complete - %

Work Began:

Est. Complete: September 2011

From south of Herbert St to Beville Rd.  Resurfacing existing roadway.

Sunday – Saturday 8:00PM to 6:30AM

Night time operations - Lane closures will occur for paving operations.   Sunday thru Thursday

 

 

 

Jane J. Morris
Construction Staff Assistant, District 5 Daytona Construction