EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content

This article has been archived and is only available for historical reference.

Major Construction Report for week of March 25, 2018

 

Interstate

Counties

Work Boundaries

Description

Link to More Information

I-4 Ultimate

Orange and Seminole

Kirkman Road to S.R. 434

Roadway widening and reconstruction. Please see website for detailed project information.

I-4 Ultimate Construction Info/alerts

Interstate 4

Volusia

I-4 Interchange Lighting and Signing

I-4 ramp closure: Tuesday - Wednesday, 10 p.m. - 5 a.m., S.R. 472 WB on ramp to I-4 EB will be closed. Traffic will be directed to take I-4 WB to Saxon Boulevard toward Deltona to access I-4 EB. Thursday - Friday, 8:30 p.m. - 6 a.m., single lane closure on I-4 WB west of the Dirksen Drive interchange.

435056-1/I-4 Interstate Lighting in Seminole and Volusia Counties

Interstate 95

Volusia

Widening from S.R. 44 to S.R. 600 (U.S. 92)

I-95 SB On Ramp at U.S. 92 closed Monday - Thursday, 10 p.m. - 6 a.m. All lanes of U.S. 92 will be closed at I-95 and the I-95 SB on ramp will not be accessible. Traffic will be detoured using Tomoka Farms Road, Bellevue Avenue, Williamson Boulevard and Beville Road to access I-95 SB. Sunday - Saturday, 7 a.m. - 7 p.m. and 9 p.m. - 6 a.m., I-95 NB & SB lane closures from U.S. 92 to south of I-4. Wednesday, 10 p.m. - 6 a.m., inside lane closure on the ramp from I-4 EB to I-95 NB. The ramp will be open.

242715-2/I-95 Widening and Systems Interchange Reconstruction North of SR 44 to North of US 92

I-95 Lighting and Signing at Five Interchanges

I-95 Ramp Closures at LPGA Boulevard Monday - Wednesday, 10 p.m. - 6 a.m. One ramp will be closed each night. Detours are as follows: I-95 NB on ramp from LPGA eastbound - Traffic will continue east and turn right onto Technology Drive, left onto Cornerstone Boulevard, left onto Williamson Boulevard and left onto LPGA EB to the I-95 NB ramp.  I-95 SB on ramp from LPGA Boulevard EB - Traffic will be directed to use Tomoka Farms Road, proceed past U.S. 92 to Bellevue Avenue, Williamson Boulevard and Beville Road back to I-95 SB. I-95 SB off ramp to LPGA Boulevard - Continue south on I-95 to U.S. 92 WB and north on Tomoka Farms Road back to LPGA Boulevard.

435059-1/I-95 Interstate Lighting at Five Interchanges

Brevard

Interchange at St. Johns Heritage Parkway/Palm Bay Parkway

Monday - Saturday, 7 a.m. to 5 p.m., I-95 NB & SB single lane closures for construction of new interchange.

426904-3/I-95 Interchange at St. Johns Heritage Parkway/Palm Bay Parkway

New Interchange at I-95 and Viera Boulevard

Monday - Friday, 7 a.m. to 5:30 p.m., I-95 NB & SB single lane closures for construction of new interchange. Monday - Friday, 9 p.m. to 7 a.m., I-95 NB double lane closures for construction of new interchange.

428238-1/I-95_Interchange_at_Viera_Boulevard

When you see orange, please slow down and stay alert!

As a reminder, FDOT’s 511 Traveler Information System offers five convenient ways for drivers to check real-time traffic conditions: call 511; visit FL511.com; download the Florida 511 app for Apple or Android devices; follow @FL511_Central on Twitter; or sign up for a “My Florida 511” account on FL511.com to receive personalized alerts.