EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content

This article has been archived and is only available for historical reference.

ORLANDO — Hughey Avenue from Church Street to South Street is closing for approximately one year beginning the night of Sunday, October 1.

The closure will provide a safe work zone for I-4 Ultimate crews to construct the new westbound I-4 exit ramp to State Road (S.R.) 408.

The intersections of Church Street and South Street will remain open for vehicles and pedestrians to travel across Hughey Avenue. A covered pedestrian walkway will be constructed on Church Street to allow pedestrians to safely cross through the construction area.

For motorists heading south on Hughey Avenue from Colonial Drive (S.R. 50), the detour around this closure will be:

View or download an online map of the detour for this closures at: http://fdot.tips/Hughey.

Access will be limited on Hughey Avenue from Central Boulevard to Church Street during events at the Amway Center. For more information about parking and directions to the Amway Center, visit: http://www.amwaycenter.com/plan-your-visit/directions-parking.

Modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving through the work zone.

The I-4 Ultimate project is rebuilding 21 miles of Interstate 4 (I-4) from west of Kirkman Road in Orange County to east of State Road 434 in Seminole County, adding two new dynamic tolled Express Lanes in each direction, replacing more than 140 bridges, reconfiguring 15 major interchanges and reconstructing the entire roadway.