Week of March 19, 2017

Interstate

Counties

Work Boundaries

Description

Link to More Information

I-4 Ultimate

Orange and Seminole

Kirkman Road to S.R. 434

Roadway widening and reconstruction. Please see website for detailed project information.

I-4 Ultimate Construction Info/alerts

Interstate 4

Volusia

Widening from S.R. 44 to I-95

Monday - Friday, 7 a.m. - 5 p.m., intermittent single lane closures possible on I-4 EB and WB between S.R. 44 and I-95.

Project-408464-1 I-4 Widening from SR 44 to East of I-95

Volusia

I-95/I-4 System to System Interchange

Wednesday - Thursday, 9 p.m. - 6 a.m., I-4 eastbound and westbound lane closures near the I-95 interchange for paving operations.

242715-2/I-95 Widening and Systems Interchange Reconstruction North of SR 44 to North of US 92

Interstate 75

Sumter

Widening from Hernando County Line to CR 470

Sunday - Tuesday, 8 p.m. - 7 a.m., I-75 SB from south of C.R. 470 to north of the rest area.

Project/242626-2/I-75 from Hernando County Line to CR 470

Sumter

South of C.R. 470 to South of the Turnpike

Road Closure and Detour, March 13 - 27, C.R. 470 at the railroad crossing will be closed. A detour will be in effect.

Project/242626-3/I-75 from South of CR 470 to South of the Turnpike

Sumter

I-75 & Turnpike Interchange

Sunday - Thursday, 9:30 p.m. - 6 a.m., I-75 NB, 10:30 p.m. - 6 a.m., I-75 SB, single, and occasional double, lane closures, between Florida's Turnpike and Exit 329 (S.R. 44).

Floridasturnpike.com/Projects/406110-1/Interchange.pdf

Marion

S.R. 500/U.S. 27 to Alachua County Line

Sunday - Friday, 7:30 p.m. - 6 a.m., I-75 NB inside lane closures between S.R. 326 and C.R. 318.

Project-430643 I-75 North of US 27 Interchange to Alachua County line

Interstate 95

Volusia

Widening from S.R. 44 to S.R. 600 (US 92)

Traffic Shift Monday, March 20, 9 p.m. - 6 a.m., I-95 southbound from north of the S.R. 421 interchange to S.R. 44 to shift traffic to the final alignment over S.R. 421 and Spruce Creek. (Tuesday, March 21, is the backup date for the switch if needed). Traffic Shift Tuesday, March 21, 9 p.m. - 6 a.m., I-95 northbound traffic will shift from south of I-4 to just north of I-4, requiring a single lane closure for the shift. (Wednesday, March 22, is the backup date if needed).  Monday - Friday, 9 p.m. - 7 a.m., I-95 northbound and southbound inside lane closure between S.R. 421 and Spruce Creek. Monday - Friday, 7 a.m. - 6 p.m., I-95 southbound inside lane closure from north of U.S. 92 to U.S. 92 for hauling embankment material. Monday, 9 p.m. - 6 a.m., I-95 southbound inside lane closure north of U.S. 92 for deck pour. Ramp Closure Thursday, 9 p.m. - 6 a.m., I-95 southbound to U.S. 92 ramp closed for paving operations. I-95 southbound traffic will be directed to exit at Exit 265 and follow LPGA Boulevard south to U.S. 92. Wednesday - Friday, 9 p.m. - 6 a.m., I-95 northbound outside lane closure from south of I-4 to north of I-4 for setting barrier wall. Saturday, 9 p.m. - 6 a.m., 9 p.m. - 6 a.m., I-95 southbound outside lane closure south of Spruce Creek for bridge demolition.

242715-2/I-95 Widening and Systems Interchange Reconstruction North of SR 44 to North of US 92

Please Drive Safely Through Construction Zones. Slow Down. Stay Alert.

As a reminder, FDOT’s 511 Traveler Information System offers five convenient ways for drivers to check real-time traffic conditions: call 511; visit FL511.com; download the Florida 511 app for Apple or Android devices; follow @FL511_Central on Twitter; or sign up for a “My Florida 511” account on FL511.com to receive personalized alerts.