EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Skip to Content
Interchange Construction on Interstate 75 in Sumter County near City of Wildwood
  • Sunday, December 9th, 2018 to Wednesday, December 12th, 2018

    9 p.m. to 6 a.m.
    Northbound and southbound lane closures from Exit 321 (County Road 470) to Exit 329 (State Road).

  • Thursday, December 13th, 2018 to Friday, December 14th, 2018

    12:30 to 4:30 a.m.
    All northbound lanes at Exit 321 (County Road 470) 
    will be closed. Traffic will be directed to exit at Exit 321 and take County Road 470 west to U.S. 301. From there, motorists will travel north to State Road 44 and merge back onto I-75 North at Exit 329.

Widening in Osceola County near City of Kissimmee [418403-2] View Project
  • Monday, December 10th, 2018 to Friday, December 14th, 2018

    8:30 a.m. to 10 p.m.
    Road closure on Mabbette Street
    from John Young Parkway to Thacker Avenue for striping. Detour will be in effect.

  • Monday, December 10th, 2018 to Friday, December 14th, 2018

    7 a.m. to 6 p.m.
    Northbound and southbound lane closures on John Young Parkway from Portage Street to W. Columbia Avenue to clean curb.

Widening in Volusia County near City of Daytona Beach [242715-2] View Project
  • Sunday, December 9th, 2018 to Saturday, December 15th, 2018

    U.S. 92 closed at I-95 Sunday - Tuesday (& Wednesday if needed), 10 p.m. - 6 a.m. Both eastbound and westbound lanes will be closed, including the eastbound U.S. 92 ramp onto northbound I-95. Traffic will be detoured using Tomoka Farms Road, Bellevue Avenue and Williamson Boulevard.

    Westbound U.S. 92 closed Wednesday (& Thursday if needed), 10 p.m. - 6 a.m. Traffic will be directed to take Williamson Boulevard to Bellevue Avenue to Tomoka Farms Road and back to U.S. 92.

    Northbound I-95 ramp to U.S. 92 closed Wednesday, 10 p.m. - 6 a.m. Traffic will be directed to exit onto Beville Road and take Williamson Boulevard north.

    Eastbound I-4 ramp onto northbound I-95 and westbound Beville Road ramp onto northbound I-95 closed Thursday, 10 p.m. - 6 a.m. Eastbound I-4 traffic will be directed to exit onto Beville Road. Traffic will be directed to take Williamson Boulevard north to U.S. 92 to access northbound I-95.

    Eastbound U.S. 92 ramp onto northbound I-95 closed Thursday, 10 p.m. - 6 a.m. Traffic will be directed to take Williamson Boulevard north to LPGA Boulevard to access northbound I-95.

    Northbound I-95 Collector/Distributor Road closed Thursday, 10 p.m. - 6 a.m., including the northbound I-95 ramps to U.S. 92 and westbound I-4. Traffic will be directed to exit onto Beville Road and take Williamson Boulevard north, following the detour to U.S. 92 and westbound I-4.

    Monday  - Saturday, 7 a.m. - 7 p.m., and 9 p.m. - 6 a.m., northbound and southbound I-95 lane closures from U.S. 92 to south of I-4.

Resurfacing on US 441 in Orange County near City of Apopka [437338-1] View Project
  • Sunday, December 9th, 2018 to Friday, December 21st, 2018

    The Contractor will be closing one lane at a time on northbound and southbound US 441 between the 429 Connector Road to West of Lake Doe Blvd. The Contractor will be paving.

    • Sunday, December 9 thru Friday December 14
    • From 7 p.m. to 7 a.m.

     

    • Sunday, December 16 thru Friday December 21
    • From 7 p.m. to 7 a.m.

     

  • Monday, December 10th, 2018 to Friday, December 21st, 2018

    The Contractor will be closing one lane at a time on northbound and southbound US 441 between the 429 Connector Road to West of Lake Doe Blvd. The Contractor will be excavating and pouring concrete

    • Monday, December 10 thru Friday December 14
    • Southbound - From 9:30 a.m. to 7 p.m.

     

    • Monday, December 17 thru Friday December 21
    • Northbound - From 7 a.m. to 3 p.m.

     

Widening on SR 482 in Orange County near City of Orlando [407143-5] View Project
  • Monday, December 10th, 2018 to Friday, December 14th, 2018

    8 p.m. to 7 a.m.
    Eastbound and westbound alternating lane closures from Universal Boulevard to John Young Parkway. Contractor will continue to work on temporary barrier walls and crash cushions in various locations. They will also have various lane closures for Shingle Creek bridge work in both eastbound and westbound directions and for drainage/force main/ water main work.