> Project Description

Project Number: 240231-3-52-01
Roadway Description: SR 434 from Maitland Boulevard to Lotus Landing Boulevard


View Current Projects - Seminole County in a larger map

About this Project:
  • Widen from 4-lane rural roadway to 6-lane divided urban roadway with curbed grass median, sidewalks, and irrigation sleeves from SR 414 (Maitland Blvd.) to Lotus Landing Blvd. (MP 0.063 – 0.776); Mill & resurface existing 4 lanes
  • Closed drainage system within existing FDOT Right-of-Way (no ponds will be constructed with this project)
  • Noise wall along east side of roadway from Hill View Dr. to south of Lotus Landing Blvd.
  • Signalization to include new mast arms at Lotus Landing Blvd. and replacement of traffic loops
  • Signing and pavement marking to current FDOT standards
  • Utility coordination and relocation is anticipated, including a Utility Work by Highway Contractor with the City of Altamonte Springs

Project Details:

• Contract #: E5N43
• County: Seminole
• Total Cost: $4,643,000.00
• Est. Completion: Summer 2010
• Contractor: Southland Contruction / DRMP
• Project Website:

Not Available


Contact Person:

Steve Olson, (407) 482-7813, (386) 943-5479
Send Comments and Questions: Here

Lane Closures:

September 5, 2010 - September 11, 2010     
  • No lane closures are scheduled.
 
August 29, 2010 - September 4, 2010     
  • Intermittent lane closures are scheduled in both directions on SR 434 between Lotus Landing Boulevard and Maitland Boulevard Sunday, August 29 through Saturday, September 4 for paving operations.