> Project Description

Project Number: 238677-1-52-01
Roadway Description: Baseline Road from SR 40 (Silver Springs) to SR 464 (Maricamp Rd.)


View Current Projects - Marion County in a larger map

About this Project:
This stimulus project consists of the reconstruction of the existing two-lane rural roadway to four-lane urban roadway with sidewalks and provisions in the median for future six-lane widening from south of SR 464 to north of SR 40. The project also includes the widening, milling and resurfacing along SR 464, CR 314 and SR 40. Closed drainage system to include 9 ponds and ditch treatment facilities within FDOT Right-of-Way. Structural work includes 2 new twin bridges and retaining walls at SR 35 and SR 464
Project Details:

• Contract #: E5N45
• County: Marion
• Total Cost: $23 Million
• Est. Completion: Summer 2011
• Contractor: C.W. Roberts Contracting, Incorporated
• Project Website:

Not Available


Contact Person:

Steve Olson, (352) 427-4054, (386) 943-5479
Send Comments and Questions: Here

Lane Closures:

September 12, 2010 – September 11, 2010
  • Northbound and southbound flagging operations on S.R. 35 (Baseline Road)
  • 9 a.m. to 6 a.m.
September 5, 2010 – September 11, 2010
  • No lane closures anticipated