427645-1
SR 520 from West of Myrtice Ave to SR 3 Courtney Parkway

About

This is a Highway Safety Improvement Program project, constructing raised medians from the relief bridge to Courtney Parkway. Signalization improvements and resurfacing are also planned. Additional resurfacing work has been added to the project to resurface the roadway between the relief bridge and the twin span high rise bridge known as the Hubert Humphrey Bridge.

Current News

  • None at this time. Two stakeholder meetings were held, one before the design began, and another once the design reached 60% complete. The intial meeting presetnation can be dowloaded from this site.
  • A Stakeholder meeting was held for the public on September 2, 2010. The Powerpoint demonstration of the presentation can be downloaded below. 
  • An additional Stakeholder Meeting was held March 24th, 2011.
  • The addtional design work has been incorporated into the project.
  • Utiltiy coordination has been completed