238677-1
Baseline Road (SR 35) from SR 40 (Silver Springs) to SR 464 (Maricamp Rd.)

You have been redirected from an old link, please update your bookmarks.

Project has been completed

No furthur updates will occur.

About

This stimulus project consists of the reconstruction of the existing two-lane rural roadway to four-lane urban roadway with sidewalks and provisions in the median for future six-lane widening from south of SR 464 to north of SR 40.

The project also includes the widening, milling and resurfacing along SR 464, CR 314 and SR 40.

Closed drainage system to include 9 ponds and ditch treatment facilities within FDOT Right-of-Way.

Structural work includes 2 new twin bridges and retaining walls at SR 35 and SR 464