428945-1
I-95 (SR9) from Brevard Co line to N of pavement chg at MP 6.771

You have been redirected from an old link, please update your bookmarks.

About

This project includes milling and resurfacing of I-95 in Volusia County.  It also includes upgrades to guardrail and ADA improvements of emergency call box landings. 

This project is within the limits of project 406869-8, which is a design/build/finance project.  The total length of this project has not yet been determined.  When the contract is awarded in May of 2012, the project length will be finalized. If this total length includes the entire section from the Brevard line to MP 6.771, the resurfacing project will be deleted.  This is a pilot smart project.