427249-1
US 301/SR 200 Mill and resurface from US 441/25 to CR 200A/NE 172 Pl

You have been redirected from an old link, please update your bookmarks.

About

The project will mill and resurface the existing pavement, correct an erosion issue and address the median opening at NE 155th St.

Current News

This project will rehabilitate the pavement so that it will ride better. Change the diagonal signal (2 poles) at CR 316 to a box (4 poles)